1. UMass Amherst Receives $1.1 Million Grant for Large Battery Project

    UMass Amherst Receives $1.1 Million Grant for Large Battery Project

    UMass Amherst has been awarded a $1.1 million state grant from the Advancing Commonwealth Energy Storage (ACES) project to work with Tesla Energy to construct a large battery at the Central Heating Plant on the west side of campus. The project involves a 1-megawatt/4-megawatt-hour lithium ion battery storage system that will be designed and constructed by Tesla Energy adjacent to the campus power plant. Working with Tesla and the UMass Clean Energy Extension (CEE), the goal is to reduce peak energy demand on the Amherst campus and related costs. The battery storage system will provide power at times ...

    Read Full Article

    Login to comment.

  1. Categories

    1. Industry Clusters:

      Aerospace/Defense, Business Development, Creative Economy, Education, Energy, Entrepreneurship, Financial Services, Green Region, Health Care, Information Technology, Life Sciences, Logistics, Manufacturing, Medical Devices, Paper Manufacturing, Plastics, Retail, Tourism, Transportation, Workforce
  2. Quotes

    1. We're very excited to be able to integrate a 1-megawatt lithium ion battery into our utility infrastructure on campus.
  3. Topics Mentioned

  4. Authors